Aloha Carpentry & Construction

Storefront Capable

Commercial Projects

Tenant improvements, storefront install, commercial framing, demising walls, ADA compliance, and light commercial remodel under one WA general contractor license.

  • Licensed

    WA General Contractor

    ALOHACC772JF

  • Owner on site

    Every project

    No subbed framing

  • References

    On request

    Prior project list

  • Based in

    Everett, WA

    Greater Seattle Area

The problem

Commercial work is not residential work scaled up. The framing schedule has to line up with a tenant move in date that does not move. The demising wall has to meet the landlord's spec and the AHJ's life safety review. The storefront has to be glazed without holding up the rest of the trades. A residential carpenter who has never run a commercial schedule will overpromise on dates and underdeliver on the punch list. Aloha runs commercial because Ricki has run commercial.

Aloha holds the WA general contractor license and runs commercial tenant improvements, light commercial remodel, storefront install, and commercial framing work across the Greater Seattle Area. Recent commercial work includes a full credit-union storefront tenant improvement, so the storefront and TI playbook is current. We do not chase ground up commercial new construction, but for tenant improvements, demising work, ADA upgrades, and storefront install we are equipped for it.

Wider view of finished commercial storefront in a retail context
Storefront in context. Tenant improvement closed out and ready for occupancy.

What’s included

Every line of the scope, on the table.

  • Tenant improvement framing and finish (light commercial)
  • Storefront install and storefront glass coordination
  • Demising walls (one hour and two hour rated where required)
  • Commercial framing (light gauge and dimensional)
  • ADA compliance work (door widening, threshold, restroom layout)
  • Commercial door install (storefront entry, back of house steel)
  • Light commercial remodel (retail buildout, office buildout, food and beverage shells)
  • Coordination with commercial plumber, electrician, mechanical, and life safety subs
  • Permit and life safety review coordination with the AHJ
  • Schedule pressure understood (tenant move in dates respected)
“We don’t sub out the carpentry. We build it ourselves. That’s the difference.”
Ricki Morgenstein · Lead Carpenter, Aloha Carpentry & Construction, LLC

Documented work

Recent commercial.

View full gallery
Detail view of commercial storefront entryCommercial

Storefront detail. Entry door, threshold, sidelite glazing.

Wider view of finished commercial storefront in a retail context

Storefront in context. Tenant improvement closed out and ready for occupancy.

Commercial framing with structural steel beams in place

Commercial framing with structural steel. Coordination with the steel erector before light gauge fill in.

Commercial interior framed up with rough partitions visible

Tenant improvement rough framing. Demising walls and partition layout before drywall.

Why Aloha

What you’re actually paying for.

  • 01

    Commercial schedule respected

    Tenant move in dates do not move. We build the schedule backward from the deadline and we hit it. Our most recent commercial job was a credit-union storefront tenant improvement.

  • 02

    Demising and rated assemblies built to spec

    One hour and two hour rated demising walls built to the assembly the AHJ requires, with the documentation to clear life safety review. No improvised assemblies.

  • 03

    Storefront capable

    Storefront glazing coordinated with glaziers we work with regularly. Aluminum entry systems and threshold details run through our crew on the carpentry and finish side.

  • 04

    Honest scope boundary

    We do not chase ground up commercial new construction. We do tenant improvements, light commercial remodel, storefront install, demising, and ADA work. Within that lane we are equipped and current.

Implementation

What the day looks like.

Most commercial engagements run from four weeks (single tenant improvement on an existing shell) to twelve weeks (full branch renovation or multi suite demising buildout). Material lead times on storefront glass and commercial doors drive the front of the schedule. We order at contract signing so material is staged by the time framing closes in. Site protection on every commercial job, with attention to the rest of the building's tenants where the work is in a multi tenant complex.

References available on request for tenant improvement, light commercial remodel, and storefront install scopes. Past commercial work includes credit-union storefront and retail tenant improvements across the Puget Sound region.

Why this scope, with us

Commercial schedule pressure understood. Tenant move in dates respected.

Storefront glass, demising walls, ADA compliance, and commercial door install all live within our regular scope — most recently on a credit-union storefront tenant improvement. Within the tenant improvement lane, we are current and equipped.

Frequently asked

The questions that come up before booking.

  • Do you take on full commercial tenant improvements?

    Yes. Storefront, demising walls, ADA work, and interior framing on the same job — most recently a credit-union storefront tenant improvement. References available on request.

  • Do you build to landlord criteria and tenant criteria both?

    Yes. Both sets of criteria reviewed at the assessment phase, conflicts surfaced before contract, and the work built to whichever standard applies to that scope element. Demising walls to landlord spec, interior tenant finish to tenant spec.

  • Can you coordinate the commercial plumber, electrician, and mechanical?

    Yes. We hold the GC license and run a roster of commercial subs we work with regularly across Snohomish County. They run on our schedule and bill transparently in the project line items.

  • Do you do ground up commercial new construction?

    No. We do not chase ground up commercial. Our lane is tenant improvement, light commercial remodel, storefront install, demising, and ADA upgrades.

  • How do you handle the tenant move in deadline?

    Build the schedule backward from the deadline. Material lead times resolved at contract signing so storefront glass and commercial doors are staged on time. Weekly progress updates to tenant and landlord so nothing surprises anyone at the final walk.

Commercial — talk first

Walk the space with us before the tenant criteria gets locked.

Existing drawings or tenant criteria sent to the address above help us prep. Site walk scheduled within the week. Written itemized quote with a phased schedule in your inbox within three business days.

Direct line

(425) 835-2728

Mon to Fri · 8am to 5pm · Sat by appointment. Active emergencies get a same-day callback.

Or send through the intake form